AI Data Center Cluster Calculator
Enter the size of a GPU cluster and where it will run. The calculator shows the power it needs, what it costs to build and run, and the largest model it could train. It uses the same published figures and formulas as my scaling planner notebook.
Where the investment goes
Power check
What it can train
Convert power to yearly energy
Power (MW) is how much the grid has to deliver at once. Energy (GWh) is how much it delivers over time. 1 MW running all year is 8.76 GWh.
Hardware cost counts the GPU systems only. Networking and storage add power, which the calculator includes, but they have no published price here, so treat the total as a floor. Facility cost uses the midpoint of a published per-megawatt range. Energy and electricity assume full load all year, which is an upper bound. GB200 NVL72 pricing is an analyst estimate, not a list price. Electricity rates are EIA average industrial prices for November 2025 (Electric Power Monthly, Table 5.6.A). Sources for every figure are listed in the README. This is a planning calculator, not a forecast.